Fire Island Wind Turbine Maintenance

ALASKA CRANE

Subsidiary: Alaska Crane

Client: Fire Island Wind, LLC

Location: Fire Island, Alaska

Completed: December 2024

Alaska Crane played a key role in the successful completion of the Fire Island Gearbox Replacements, overcoming unique logistical challenges posed by the island’s tidal conditions.

The project utilized the Liebherr LTM 1500 configured with 161’ of luffing jib, operating at a maximum 100’ radius to safely and efficiently lift and replace 34,000-pound gearboxes. ACL provided a certified operator, a qualified rigger/signalman, and comprehensive lift planning to ensure seamless execution.

Despite the complexities of coordinating demobilization with high tide access, ACL demonstrated its expertise and commitment to delivering safe, reliable, and efficient crane services under demanding conditions.

Gallery

Let’s build something extraordinary together.